Ask the man in the trenches

A general discussion area for turkey hunters.
Post Reply
User avatar
Gobbler
Gobbler Nation
Gobbler Nation
Posts: 7279
Joined: June 27th, 2011, 2:01 pm

Ask the man in the trenches

Post by Gobbler »

You don't have to be an engineer to appreciate this story.

A toothpaste factory had a problem: they sometimes shipped empty boxes, without the tube inside. This was due to the way the production line was set up, and people with experience in designing production lines will tell you how difficult it is to have everything happen with timings so precise that every single unit coming out of it is perfect 100% of the time. Small variations in the environment (which can´t be controlled in a cost-effective fashion) mean you must have quality assurance checks smartly distributed across the line so that customers all the way down to the supermarket don't get mad and buy another brand instead.

Understanding how important that was, the CEO of the toothpaste factory got the top people in the company together and they decided to start a new project, in which they would hire an external engineering company to solve their empty boxes problem, as their engineering department was already too stretched to take on any extra effort.

The project followed the usual process: budget and project sponsor allocated, RFP, third-parties selected, and six months (and $8 million) later they had a fantastic solution - on time, on budget, high quality and everyone in the project had a great time. They solved the problem by using high-tech precision scales that would sound a bell and flashlights whenever a toothpaste box would weigh less than it should. The line would stop, and someone had to walk over and yank the defective box out of it, pressing another button when done to re-start the line.

A while later, the CEO decides to have a look at the ROI of the project: amazing results! No empty boxes ever shipped out of the factory after the scales were put in place. Very few customer complaints and they were gaining market share. "That's some money well spent!" - he says, before looking closely at the other statistics in the report.

It turns out; the number of defects picked up by the scales was 0 after three weeks of production use. It should´ve been picking up at least a dozen a day, so maybe there was something wrong with the report. He filed a bug against it, and after some investigation, the engineers come back saying the report was actually correct. The scales really weren't picking up any defects, because all boxes that got to that point in the conveyor belt were good.

Puzzled, the CEO travels down to the factory, and walks up to the part of the line where the precision scales were installed. A few feet before the scale, there was a $20 desk fan, blowing the empty boxes out of the belt and into a bin.

"Oh, that," says one of the workers - "one of the guys put it there ´cause he was tired of walking over..... 'every time the bell rang".
User avatar
Hognutz
Gobbler Nation
Gobbler Nation
Posts: 8210
Joined: June 28th, 2011, 5:29 pm
Location: S.E. Wisconsin. Global Flatulater

Re: Ask the man in the trenches

Post by Hognutz »

Good one. Never forget about the guy actually doing the work. I've seen it too many times..
May I assume you're not here to inquire about the alcohol or the tobacco?
I am the man from Nantucket.
“Leave the gun, take the cannoli” -Clemensa
When attacked by a group of clowns...Go for the Juggler!!
User avatar
Turkey Talker
Gobbler Nation
Gobbler Nation
Posts: 3665
Joined: June 7th, 2011, 9:20 pm
Location: Green Swamp Florida

Re: Ask the man in the trenches

Post by Turkey Talker »

HAHAHAHAA thats awesome!
Image
Image
Image
User avatar
Grover
Gobbler Nation
Gobbler Nation
Posts: 1121
Joined: July 3rd, 2011, 12:11 pm
Location: Central Illinois

Re: Ask the man in the trenches

Post by Grover »

Sounds like the outfit I work for.
"INFIDEL"
Post Reply

Return to “Gobbler Talk”